Instrumentation Calibrations (M.&T.E.), Q.C. Inspector,Sourced Parts Inspections Resume
|
| Desired Industry: Manufacturing |
SpiderID: 8572 |
| Desired Job Location: Houston, Texas |
Date Posted: 8/31/2006 |
| Type of Position: Contractor |
Availability Date: Oct.5,2006 |
| Desired Wage: T.B.D. |
|
|
U.S. Work Authorization: Yes |
| Job Level: Experienced with over 2 years experience |
Willing to Travel: |
| Highest Degree Attained: Other |
Willing to Relocate: Yes |
Objective:
OBJECTIVE: Independent Consultant/Contractor. Thirty years experience in Instrumentation Calibrations, in 58 Certification Types, including Accuracy/Tolerances; Methodologies; Traceability; Repairs, Documentations, etc. Available for World Wide Travel, USA Passport current.
SKILLS: „X Level 3 Nuclear Metrology per 10 CFR 50, CRITERIA 12, N.45.2.6, (1978-85). „X Measuring and Testing Equipment (M&TE), Q.C. inspections using and teaching these instruments to over 50 Instrumentation Techs, Q.C. Inspectors, Craftsmen, and Technicians at Petro-Chem, Nuclear, Aero-space Manufacturing, and Industrial Machined, Screw, Hydraulic Pressed, Plastic Injections plants, as well as in coming out sourced parts, first piece and production runs. „X 10+ Years Petro-chem in operational modifications and construction modes, instrumentation calibrations, and as foreman teaching over 30 i.&c. techs the art of calibrations, records, traceability, dismantling, parts replacements, assemblage, of pressure gauges, torque wrenches, thermo-humidi-graphs, oxygen analyzers, thermometers, micrometers( inside, outside, pipe, plate, etc.), integument thickness, dial indicators, etc. „X 8 years in Aerospace, Atlas (satellite launching) Rockets, Q.C. Senior Inspector. Certified over 100 Atlas Rocket mechanics in use of m.&t.e. and actual production measurements. (First person to MAX the m.&t.e. accuracy usage tests at Lockheed Martin, Inc., Harlingen, Texas Atlas Rocket facility). Retired March 25, 1998. „X 7 years Nuclear Power Electric Generating Plants. South Texas Nuclear power Electric Generation Station, 4 years as a calibrations technician. Then supervisor for three years, starting with: the reopening of the metrology instrumentations calibrations lab, post closure, from Brown and Root to Ebasco. Hired, trained, and certified a complete staff of 14 to cover 1000 + instruments over a range of 58 m.&t.e. categories and the necessary lab standards. At Palo Verde Nuclear Power Electric Generating Station, Arizona, I calibrated pressure gauges that measure pressure to .001 inch of water column. „X 4+ Years as Consultant and Calibrated Equipment for Insecticides (poisons), Herbicides and Fertilizers, USA and Mexico, correcting many old, some times very dangerous, practices in Mexico. Familiar with a dialect of Spanish, spoken in the Sierra Madre Oriental Mountains, and desert of north central Mexico. „X Inspected steel/ metal fabrications plants in Mexico, Certified in: ASME; AWS; API; ASTM; AISI/ SAE; ISO 9000; ISO 9001, in productions of large vessels, loops, piping, and shipped to a new Canadian petro-chem plant in construction. „X Q.C. Inspector and Instrument Calibration Technician using M & T. E. to inspect injection moldings, hydraulic pressed, and machined products, first and production run, at a twin plant operation, parts produced in Brownsville, Texas, and then assembled in Mexico. „X Calibrated: Pressure/ Vacuum, Torque (up to 6000 ft-lb), Dimensional, Oxygen Analyzers, Levels, Hydro-test, Temperature/Humidity, (etc.) Gauges/ Recorders. „X Foreman of M & T. E. Lab, pressure, temperature, humidity, (calibrations and records) for construction and hydro tests integrities. Resolved Federal and State, Wyoming, E.P.A. concerns and issues, at a world class H2S- sulfur extraction petro-chem plant, under construction. I and 2 calibration technicians, used the most accurate pressure indicating m&te instruments available, witnessed and performed for the duration, an 8 hour hydro-test,22 inch pipeline, 14 miles in length, (7500+ cu. ft. air bubble) at 4480 to 5000 psig. „X Supervised M & T. E. Instrumentation Calibrations used on project including, training, maintaining records, lab standards, etc.
OTHER SKILLS: „X Appeared as ¡§FRIEND OF THE COURT¡¨, involving litigation between Individual and Petroleum Company, providing methodology to resolve litigation and problems. „X Resolved Federal, and State E.P.A. concerns, Shute Creek, WY (Exxon¡¦s H2S/ sulfur extraction petro-chem plant construction), concerning instrumentation calibrations, traceability and records integrity „X Inspected 6 steel/metal fabricators, and 5 commercial fabric sewing factories in Mexico to recognized standards WORK HISTORY: „X Veijo Consultant, Cuatro Cienegas, Coahuila, MX, 4 / 04 ¡V Present „X Investor, Properties Investment Co., Seven Points, TX, 3 / 98 - 4 / 04 „X Atlas Rocket Senior Inspector, Lockheed Martin, Harlingen, TX, 1 / 90 - 3 / 98 (retired Mar.25,1998) „X Q.C. Inspector/Instrumentation/Calibrations, Ranco Inc., Brownsville, TX, 8 / 88 - 1 / 90 „X Agricultural Consultant, Self Employed, Harlingen, TX, 7 / 87 - 9 / 88
PRIOR TO 1990: „X Metrologist Instrument Calibrations, Volt Information, Phoenix, AZ „X Instrumentation Calibrations, Love Construction Co, Lake Charles, LA „X Foreman Instrumentation Calibrations, Project Const. Co., Exxon¡¦s Shute Creek, WY „X Supervisor, Brown and Root Inc & Ebasco, Inc., Bay City, TX
Experience: 30 years, Measuring and Testing Equipment (M.&T.E.)Instrumentation Calibrations Specialist, Level III, ANSI N45.2.6, 10CFR50, Critera 12. See Resume, Please.
Education: Please see resume
Affiliations: Please see resume
Skills: Please see resume
Additional Information: F E M A Disaster Inspector, Parsons Brenkerhoff Certification, # 54048
Reference: Please see resume
Candidate Contact Information:
| Name: Lonnal Wilhelm |
|
| Street: |
Phone: - |
| City: - |
Fax: - |
| State: Texas |
|
| Zip: - |
|
| Web Site: |
|
|
|
|